Our Company makes several thousand electric designs as well as a number of general construction designs annually. Below are examples of these projects:

• Multi-branch/full construction design of an office building and investment supervision for Premium Truck Sp. z o.o.;
• Civil engineering design of an extension to H5 system 110/15 kV Main Transformer Station-MTS (GPZ) Chrzanówek;
• Civil engineering design of an extension to H5+1 system 110/15 kV MTS Staroźreby;
• As-built documentation for field no 3 and 5 (bypass power bus TR1) of 110kV switchboard in the substation 400/110 kV Płock (primary and secondary circuits);
• Construction design in electric branch for the project: ”Degassing installation of waste treatment plant together with electricity production and heat recuperation for ZUOK”;
• Construction design for the renovation of 110/15 kV station Lidzbark Welski;
• Construction of an office building and a production hall with a shed in the system design and build model for LIBNER Polska Sp. z o.o. in Kutno;
• Civil engineering design of a 110 kV switchboard extension by 1 field for a wind farm in MTS Żuromin;
• Design for modification of MV and low voltage grid in the framework of project: ”Collision-free crossing of a railway with Aleja Piłsudskiego, taking into account possible tram line in Płock”.;
• Creation of a power grid digital model for ENERGA-OPERATOR S.A. branches in Płock, Toruń, Kalisz, Gdańsk, Koszalin, Olsztyn, Słupsk and Elbląg;
• Investor’s supervision over construction works during renovation of historic park in Kutno;
• Design for modernization of overhead 15 kV power lines in Gulczewo Nowe;
• Construction design of a production hall (beef slaughtering; effectiveness 1 200/day) – total dimension of usable area 18 300 m2, footprint 9190 m2 and total cubature 105 852 m3-for BEEF BEEF in Kutno;
• Construction/full design of a pork slaughtering facility (surface 39 180 m2; effectiveness 1 400/hour) in Bernberg for PINI Deutschland GMbH;
• Full design of animal by-products processing plant (production capacity min. 50 tonnes/year; surface 22 813 m2) for PINI POLONIA UNO Sp. z o.o.

 

 